NOxMASTER SCR | Environment Agency | Battersea Power Station

Talk is cheap. The proof of the pudding is in the eating. When I see it, I will believe it!!

Well; this is exactly why we endlessly sign off with offering all of our prospective clients the opportunity to visit one of our various live sites in the UK, operational with our NOxMASTER™ Selective Catalytic Reduction Systems.

On the 13th October 2022 – The day before the Grand Opening of Battersea Power Station – Agriemach had the pleasure of conducting a tour of the energy centre to a select group from both the Environment Agency and DEFRA; showcasing this live energy centre and NOxMASTER™ SCR System in full operation.

Our NOxMASTER™ SCR Systems are reducing the NOx from 2x Jenbacher 612 2004kWel Natural Gas CHP`s operating at variable load based on the network demand for heat. The exhaust gas leaves the engine and enters the primary silencer fitted with Hoerbiger explosion relief valve, it then enters our mixing section where we first measure the RAW NOx Emissions. We then have fine control over the injection and atomisation of AdBlue into the exhaust stream which passes through our two stage static mixers, prior to expansion over the catalyst. The outlet of our SCR reactor then measures the treated NOx to ensure we are in line with permit conditions. After this, the heat is recovered from the exhaust gas via the heat exchanger and then onto the secondary silencer. The flue then heads up the inside of one of the iconic Battersea Power Station Chimneys.

Seeing is believing!

For further information or to book a tour at one of our many installations, please get in touch: info@agriemach.com | www.agriemach.com | +44 (0) 1342 713743